Discover how to make the most of the sun's energy with solar panels and photovoltaic technology.

Ayudas - Subvenciones Placas Solares Murcia 2024 Last updated: 26/07/2024 - Updated subsidies for solar panels in Murcia 2024 for individuals and companies. If you have ever thought about installing solar panels in Murcia and stop depending on the electricity companies and their increasingly abusive conditions, there is no better way to...

Installation of solar panels in Almeria Solar panels installation company in Almeria In ICIDE Solar Energy we are installers of solar panels in Almeria for photovoltaic self-consumption, either as or solar panel kits. We work with the best brands; Fronius and Victron and both brands are service ...

Installation for self-consumption with Fronius GEN24 5kW hybrid inverter and 10 Jinko 460Wp solar panels in Los Barreros, Cartagena. This installation of solar panels for self-consumption in Cartagena was designed in such a way that our client could expand it with lithium batteries in the future according to their needs of energy....

Are you considering installing solar panels on your home or business in Murcia? It's a great idea, after all, a photovoltaic system could help you cut your monthly electricity bills considerably. However, it can be difficult to find someone to install your solar panels with.

Have you ever wondered what is the ideal place to install the solar panels of your photovoltaic system? Although it may not seem like it, it is an important question because it will directly influence their efficiency. That is why, in this post we show you how to place your solar panels to get the most out of them. Thinking about...

Repairing your solar panels is not something you should do often, after all, solar panels have a very long lifetime (more than 20 years in many cases) and a good installation is meant to be durable. However, there are always unforeseen events that can cause problems with your...

Knowing how to clean your solar panels is essential if you are concerned about maximising the lifetime of your PV system. However, if you don't have a clear idea of what to clean and how to clean it, you may not do it properly, which could cause you more problems.

Isolated, three-phase photovoltaic solar installation Victron Multiplus II 48 5000 with 9kW of power for irrigation head. Solar photovoltaic installation for agricultural irrigation or solar photovoltaic pumping. In this isolated installation, our customer needed three-phase power to feed an irrigation head and because of the high cost of the installation, we needed to...

Installation of solar panels in Torre Pachecho for self-consumption with Fronius Primo 5.0 Kw inverter On this occasion, we have carried out the installation of solar panels in Torre Pacheco for our client using the east-west orientation. Installing the panels with a co-planar structure taking advantage of the slope of the roof is a...

Solar panels in Lorca Installation of solar panels in Lorca Self-consumption with 12 solar panels + inverter Fronius Primo 3.0 Another example of work done; This time, we moved to the town of Morata (Lorca), where we have made the installation of 12 solar panels Jinko 270Wp + inverter....

Installation of solar panels for self-consumption in La Alcayna, Molina de Segura. 10 Jinko Solar Tiger 460Wp panels with Fronius Primo 4kW inverter. In the Urbanization La Alcayna, Molina de Segura, our team of technicians installed a self-consumption system with ten 460Wp Jinko Solar Tiger panels....

Solar panels in Murcia for domestic self-consumption with Fronius PRIMO 4.0 Kw inverter Installation completed in Murcia, consisting of Fronius inverter, model PRIMO 4Kw and 16 Jinko 270W panels. This installation had a roof with an unfavourable slope, which is why it was decided to carry out the installation with a...

Off-grid solar installation with inverter charger VICTRON Multiplus II 48/3000 and lithium batteries PYLONTECH US2000C Have you ever asked yourself, how to connect to the electricity supply or how much does it cost to connect to the electricity supply for your country house, your plot or your land? Maybe you already...

Solar panels - Self-consumption in industrial building 42,4kW Industrial self-consumption on the roof of an industrial building; Installation of solar panels for self-consumption in Cartagena, executed on the roof of an industrial building, consisting of 128 Jinko solar panels of 330Wp and 2 Fronius SYMO 20.0-3 inverters of 20kW each. Installation...

Installation of solar panels with solar pergola in Murcia (Cartagena) This installation of solar panels with solar pergola required our service of structures for photovoltaic panels for the customised manufacture of a pergola for the installation of solar panels and clean and functional architectural integration. Installation selected by FRONIUS...

Victron Phoenix and GEL batteries in a stand-alone photovoltaic installation In this case, our customer needed to power some electrical equipment at a site with no electricity supply. In addition, the installation site required zero maintenance. We chose to install GEL batteries and a Victron (Phoenix) inverter. The system...

Installation of solar panels in Almeria Inverter charger Victron Multiplus II 48/5000+ Lithium battery Pylontech US2000C On this occasion we have made the installation of solar panels in Almeria isolated iberdrola, consisting of 2 inverters Victron brand, model Victron Multiplus II 48 5000 with an inverter power of 48 5000 and an inverter power of...

Installation of off-grid solar panels in Almeria, with Victron Multiplus II 48/5000 inverter charger and Jinko Solar Tiger 460W panels. Undoubtedly, the best option for an off-grid home, such as our client's in Almería, is a photovoltaic installation with an inverter charger Victron Multiplus II...

Installation of solar panels with batteries in Torrevieja Another example of work done: Having a photovoltaic installation with BYD HVS 2.56 kWh batteries adds a new dimension of savings and independence to your home. The batteries store the surplus energy generated during the day so that you can use the energy generated during the...

Photovoltaic installation for self-consumption Fronius Primo 4.0 in Murcia For this installation we travelled to Alumbres, in Cartagena. Our client needed a grid-connected installation for his ground floor house. As the space available was limited, two customised structures were designed and assembled to maximise the maximum possible power consumption.....